Explosion-proof hot and cold machine winter maintenance instructions
When the explosion-proof type hot and cold integrated machine is used at the end of the day or when it is not used by the standby, be sure to disconnect the cooling water connection pipe, clean the remaining cooling water in the pipe, and store it in a dry place to prevent freezing and expansion. Damage to machine parts (such as coolers, pumps, connecting copper pipes). The method of removing residual water is as follows:
1. The water sequence series needs to disconnect the cooling water and hot water inlet and outlet pipes and open the corresponding ball valve. Take the air gun to the hot water (outlet) inlet and let the residual medium inside the system discharge from the cooling water inlet (cooling) The water outlet is discharged from the inlet due to the electromagnetic valve. It is determined that there is no water in the pipeline and it can be stopped.
2. The standard explosion-proof type hot and cold integrated machine needs to disconnect the connecting pipe of the cooling water inlet and outlet, open the ball valve and let the machine be in a cooling state. When the cooling electromagnetic valve is opened, take the air gun and blow it into the cooling water inlet to make it from the water outlet. Discharge, determine that there is no water in the pipeline and then stop.
Kindly note, please be sure to disconnect the cooling water connection pipe when the equipment is not in use, and clean the remaining cooling water/heat transfer oil in the pipe, and store it in a dry place.
In the winter, when you do not need the explosion-proof type hot and cold machine, you need to pay attention to turn off the explosion-proof hot and cold machine and clean it as well, so as to avoid the residue affecting the performance of the explosion-proof hot and cold machine.
Verwandte Empfehlungen
-
Wie lässt sich das Problem des Ausfalls der Umwälzpumpe der Kühlanlage lösen?
1065Kühlung Heizgeräte sind in vielen chemischen, pharmazeutischen und Laboranwendungen erforderlich. Dann, wie das Scheitern der Kühlung Heizung Gerät zu lösen ist auch besorgt über, wie es zu lösen? 1. Ausfall der Umwälzpumpe Die Umwälzpumpe...
Details anzeigen -
ISG/TM Motor Test Cooling System High Voltage Failure and Treatment Measures
1199The ISG/TM motor test cooling system is divided into two types in the industry: air-cooled and water-cooled. The working principle is to first inject a certain amount of water into the water tank in the machine, and then pass the ISG/TM motor test...
Details anzeigen -
Is the choice of a centrifugal pump or a volumetric pump in a pharmaceutical laboratory?
1280Performance: In order to be able to select the type of pump that is suitable in the pharmaceutical laboratory, it is necessary to have a deep understanding of its performance and understand the difference in its specific working principle. To this...
Details anzeigen -
Chip test dedicated TES-5 series preparation instructions
928The TES-5 series for chip testing is used for electronic component testing. How to accurately detect the chip is very important. So, how much do you know about the test preparation for the TES-5 series for chip testing? Before starting the TES-5 s...
Details anzeigen