How to Solve the Problem of Water Supply in Low Temperature chiller system
Due to the improper operation of low temperature chiller system, there is the possibility of water entering into refrigerant system. Therefore, in view of the problem of water supply in low temperature chiller system, process guidance is formulated to serve as a reference for maintenance.
1. Analyse the reasons. Check the whole low temperature chiller system to confirm the cause of freezing damage and find out the leak point.
2. Blow dirt in sections.
(1) First, air compressor can be used to blow water (save nitrogen), until no water mist precipitate. Then blow with high pressure nitrogen, at the same time, heat the nitrogen (the nitrogen cylinder is prohibited from heating).
(2) Because the pipeline of low temperature chiller system is complex, water can be blown out in segments by using welding torch in some parts according to specific conditions.
(3) Heat and dry. The capillary, thermal expansion valve, compressor and other small components can be placed in the oven to bake and dry. Do replace the refrigerating oil in the compressor after the water is dried.
1. Vacuum drying
(1) Restore the pipeline and maintain the nitrogen pressure to ensure the air tightness of the system. Then connect the vacuum pump to the system for vacuum drying. (Dry filter barrel should be added to the front end of vacuum pump to avoid excessive water and gas entering the vacuum pump)
(2) In the process of vacuum drying, heat the place where water is easily stored in the pipeline, and the time can be determined according to the site.
2. Debugging and running.
(1) Make sure that the water in the system is basically removed.
(2) Connect the external drying filter barrel to the system and replace the desiccant after running for 5 minutes. At the same time, observe the operating parameters of the unit and pay attention to the sound of the compressor. If the dry filter is cold, the expansion valve frosts, and there is a pressure difference of more than 0.5 kg before and after the return air filter, stop the compressor immediately.
3. Completion of maintenance
(1) Remove the refrigerant pipe from the drying filter barrel and restore it.
(2) Check the supplementary refrigerant quantity. Turn on and check the machine running parameters to confirm normal.
Verwandte Empfehlungen
-
Beschreibung der Pumpenauswahl im Temperaturregler für dampfgesättigte Systeme
1633Das Temperiergerät für Dämpfungsanlagen ist eines der am häufigsten verwendeten Geräte in der pharmazeutisch-chemischen Industrie. Die Leistung des LNEYA Dampferzeuger-Temperaturreglers hängt von der Konstruktion des gesamten Systems und der Spezifikation des...
Details anzeigen -
What determines the price of a brand’s refrigeration and heating circulator?
1609The price of the brand's refrigeration and heating circulator is mainly determined by the three major parts of raw materials, manufacturing costs, and technical costs, which affect the subsequent quotation. The composition of the refrigeration he...
Details anzeigen -
Vocs gas condensing treatment equipment compressor maintenance instructions
1527The vocs gas condensing treatment equipment is an important equipment in the process of exhaust gas treatment. Among them, the compressor is one of the main components, and its performance is affecting the operating efficiency of the entire vocs g...
Details anzeigen -
The reason for the high pressure alarm of the TCU integrated temperature control unit
1543When the TCU integrated temperature control unit is used, it needs to be used according to the instructions in detail. Once problems are encountered, they need to be dealt with in time. Generally speaking, if we encounter a high pressure alarm fro...
Details anzeigen
LNEYA Industriekühler Hersteller Lieferant