Drei integrierte Verfahren zur Kühlung der Thermoschockprüfkammer
The three integrated thermal shock test chambers are designed and manufactured according to user requirements. They are suitable for high and low temperature impact tests of high-temperature or low-temperature environments and for high-temperature or low-temperature environments of aircraft, aerospace, military, ship, electrician, electronics and other products. test. The user can accelerate the test of the climatic environment of the whole machine (or parts), electrical appliances, instruments, materials, coatings, coatings, etc., in order to evaluate the test behavior of the test articles or samples.
During the opening period of the three integrated thermal shock test chambers, the heat is simultaneously stored in the high temperature zone and the cooling capacity is stored in the low temperature zone. After the hot and cold zones respectively reach the set parameter values, according to the preset impact mode and procedure. . The high and low temperature zones alternately deliver the corresponding energy to the test area to achieve the test effect of the product. It is worth noting that during the test, the conversion time between high and low temperature is only 10 seconds; the temperature recovery time in the test area is only 5 minutes. Artificial environment simulation that truly realizes instantaneous temperature changes.

The reliability of the product has always been a problem for domestic and foreign manufacturers. The key is that the manufacturer must manage finely, complete the process, complete testing means, and be responsible for the quality (such as the ISO9000 demonstration). At the same time, environmental testing equipment is a durable product. Some problems and design defects need to be exposed for many years to be discovered. Statistical analysis can find out the problem. A mature, highly reliable product often needs years of improvement and improvement. Therefore, the environment The test equipment manufacturer has a certain production scale and production history, which is one of the necessary conditions for the product to have high reliability.
The cooling method of the three comprehensive thermal shock test chambers must be clear to everyone. At present, the quality of the domestic comprehensive thermal shock test chamber has also been greatly improved, and domestically produced can also bring different quality to everyone.
Verwandte Empfehlungen
-
How to clean LNEYA low temperature refrigerator?
1077LNEYA low temperature refrigerators need to be cleaned after a long time of use. So, how should the cleaning be carried out? How to clean it is not wrong? The low-temperature refrigerator cleaning includes the cleaning of the cooling water system ...
Details anzeigen -
Low temperature refrigeration unit maintenance inspection
1068Low-temperature refrigeration units usually need to do a maintenance. After the maintenance is done, it is not easy to fail, and there will be more markets. If it is not easy to fail, it will not stop working, which is equivalent to saving the com...
Details anzeigen -
Destructive application effect of components in chip temperature measuring device
958The components can be tested in high-temperature and low-temperature cold sources in the microfluidic chip temperature measuring device. The destructive analysis of components is also an important application, which can measure the design, structu...
Details anzeigen -
Description of requirements for installation of glycol chiller
963Generally, after purchasing the equipmentwith the glycol chiller manufacturer, the installation manual will bedistributed to the user together. So, what should be paid attention to wheninstalling the glycol chiller?In summer, glycol chillers ar...
Details anzeigen