Anweisungen für die Blockierung der integrierten Maschinenausrüstung bei hohen und niedrigen Temperaturen
Wenn die integrierte Hoch- und Niedertemperatur-Maschine lange Zeit in Betrieb ist, kann es zu einer Blockierung der integrierten Hoch- und Niedertemperatur-Maschine kommen, wenn sie nicht gewartet wird. Wie kann man die Verstopfung lösen? Die erste...
The first thing to do is to disconnect the power supply of the equipment, open the process pipe nozzle on the compressor, disconnect the return pipe connected to the compressor of the equipment, install the repair valve, and seal it with the welding tool. A small length of copper tube tail on the low voltage side. Then disconnect the connection between the dry filter and the capillary, disconnect the compressor from the evaporator, and install a repair valve at the evaporator inlet. Charge the refrigerant from the return pipe into the evaporator and discharge it from the capillary. When the refrigerant is discharged, the charging is stopped. At this time, the dried ammonia gas is injected into the evaporator from the return pipe at a pressure of 1 MPa, so that the high-pressure brick-mixed ammonia gas is discharged from the capillary together with the refrigerant, and the charging is stopped after the cooling of the capillary port is not fogged. Ammonia. Because the dry ammonia gas has the function of absorbing moisture, it absorbs the moisture in the evaporator and the capillary, and brings the moisture out of the system with the circulation, and the refrigerant has the lipophilic property, and can be accumulated by using this characteristic. The refrigeration oil and other impurities in the pipeline are also discharged out of the system along with the cycle.
Separating the compressor of the high and low temperature integrated machine from the condenser, and installing a repair valve at the condensing inlet, charging the condenser with the refrigerant, and discharging it from the drying filter port. When the refrigerant is discharged from the filter port to be dried , stop charging. The high-pressure dry ammonia gas of 1 MPa was injected from the repair valve to the condenser, and after 2 minutes, when it was confirmed that no dirt and moisture were discharged, the dry ammonia gas was stopped and the ammonia gas cylinder valve was closed. The purpose of this is to extract moisture from the condenser and to release the oil from the system.
First connect the condenser return port of the high and low temperature integrated machine equipment to the compressor process port, and solder it with silver electrode, and then replace the dry filter. At the same time, it is injected from the compressor process port, and then soaked into the soap water. By observing whether there is a bubble, the weld of the whole system is leaked. If there is a bubble, the ammonia gas is released and re-welded with the silver electrode. Repeat the above inspection procedure for injecting gas to observe the bubbles until no bubbles emerge and there is no leakage.
Connect the pressure vacuum gauge to the compressor process nozzle of the high and low temperature integrated machine. The valve head is connected with the vacuum pump by the pressure hose. The vacuum is applied to the system for about 1 hour. The pressure in the system drops to -0.1. When the pressure is below MPa, stop vacuuming, close the pressure gauge valve, remove the vacuum pump, connect the refrigerant cylinder, and charge the system with gas in the form of gas. When the charge reaches 80% of the total amount, stop charging and connect. On the power supply, start the compression. After 10 minutes, refill the refrigerant until the required total amount is reached. Then test the machine for more than 3 hours to see if there is any blockage. Is the temperature drop inside the box normal? If it is normal, the process tube can be used. The mouth is sealed.
The blockage of the high and low temperature integrated machine equipment is solved according to these steps, and the equipment also needs regular maintenance and maintenance to make the equipment run more efficiently.
Verwandte Empfehlungen
-
Is the low temperature cooling unit – 120 degrees cooling effect reliable?
1878LNEYA specializes in the production of single-fluid cryogenic cooling units, the cooling temperature range is from -150 degrees to -5 degrees, which can meet different cooling temperature requirements. The products are widely used in low temperatu...
Details anzeigen -
Introduction of distillation principle and temperature cycle control device
1493Distillation is a common method for purifying liquid substances and separating mixtures. The boiling point of the compound can also be measured by distillation, so it also has a certain significance for the identification of pure liquid organic co...
Details anzeigen -
Hochtemperatur-Silikonöl Kühlung und Heizung Zyklus Maschine Wartung Schritte
1467The mechanical wear of the high temperature silicone oil cooling and heating cycle machine is an important factor that directly affects the refrigeration capacity. It is necessary to record the operating parameters during use, often listen to the ...
Details anzeigen -
Für welche Prozesse in Feinststoffbetrieben werden Kaltwassersätze benötigt?
1494Unternehmen, die sich mit der Herstellung von Feinstmaterialien befassen, benötigen häufig eine präzise Temperaturkontrolle während des Produktionsprozesses, um die Qualität des Produkts und die Stabilität des Produktionsprozesses zu gewährleisten. Kaltwassersätze spielen eine Schlüsselrolle in vielen Prozessen der...
Details anzeigen
LNEYA Industriekühler Hersteller Lieferant